30 de julio de 2016
PRONOSTICO VALIDO 30/0800/30/2000 HORA LOCAL.
ESTRECHO NELSON:
PARCIAL OCASIONAL NUBLADO, VIS 10 KM, VTO E/SE 10/5 KT,
MAR MAREJADILLA A RIZADA (1.0/0.5 M).
PUERTO NATALES:
PARCIAL A DESPEJADO, VIS 10 KM, VTO N/NW 2/6 KT, MAR LLANA
EN BAHIA.
PASO TAMAR:
PARCIAL, VIS 10 KM, VTO E/SE 2/6 KT, MAR RIZADA (0.5/0.3 M).
FELIX/FROWARD:
PARCIAL, VIS 10 KM, VTO NW/W ROLANDO SURWESTE 2/6 KT,
MAR LLANA.
FROWARD/PTA. DELGADA:
PARCIAL, VIS 10 KM, VTO W/SW 2/6 KT, MAR LLANA.
PUNTA ARENAS:
NUBLADO A PARCIAL, VIS 10 KM, VTO W/SW 2/6 KT, MAR LLANA
EN BAHIA.
PTA.DELGADA/DUNGENESS:
PARCIAL A DESPEJADO, VIS 10 KM, VTO W/SW 10/5 KT,
MAR RIZADA (0.5/0.3 M).
CANAL BRECKNOCK:
NUBLADO, VIS 8/10 KM CHUBASCOS, VTO SW/W 10/5 KT,
MAR MAREJADILLA (1.2/1.0 M).
TIMBALES/PTO. NAVARINO:
NUBLADO, VIS 10 KM CHUBASCOS DEBILES, VTO W/SW 2/6 KT,
MAR LLANA.
PTO. NAVARINO/I.NUEVA:
NUBLADO OCASIONAL CUBIERTO, VIS 10 KM CHUBASCOS
DEBILES, VTO W/SW 5/10 KT, MAR RIZADA (0.3/0.5 M).
PTO. WILLIAMS:
CUBIERTO, VIS 8/10 KM CHUBASCOS, VTO W/SW 2/6 KT,
MAR LLANA EN BAHIA.
B. NASSAU/C. HORNOS:
CUBIERTO, VIS 8/10 KM CHUBASCOS, VTO SE/S 10/15 KT,
MAR MAREJADILLA (1.0/1.2 M).
CABO DE HORNOS:
CUBIERTO, VIS 8/10 KM CHUBASCOS, VTO SE/S 15/20 KT,
MAR MAREJADILLA (1.0/1.2 M).
El Ministerio ingresó a evaluación ambiental un proyecto por 26 millones de dólares para concluir el "mejoramiento de la capacidad hidráulica" de Río Las Minas.
El Ministerio ingresó a evaluación ambiental un proyecto por 26 millones de dólares para concluir el "mejoramiento de la capacidad hidráulica" de Río Las Minas.